In general, what is the installation process and time point of the project?

I. Installation of metering system. The engineering department dispatches and installs the metering system according to the metering system installation order generated by the business department, technology department and product department.

、项目的功耗确认完成; 2 、技术部施工图和施工方案编制完成,并由技术部、工程部一起完成跟甲方的施工交底工作(交底工作时需要交流施工方案、机具配合、阀门状况、吊装机具等); 3 、主体设备已卸货到现场。 Second, the pre-installation work requires several pre-orders to complete before entering the installation phase: 1. The project's power consumption confirmation is completed; 2. The technical department's construction drawings and construction plans are completed and completed by the technical department and the engineering department Communicate with Party A's construction (construction work, equipment coordination, valve conditions, lifting equipment, etc.); 3. The main equipment has been unloaded to the site.

、工程部根据公司整体项目进度,每月会排出月度安装计划,对于有项目进入到安装流程的业务经理,需要确保前序工作完成对项目进展进行报备; 2 、队伍到达现场,需要由业务负责人衔接并与甲方主管部门对接完成; 3 、施工队伍将对施工交底的内容进行进一步核实,确定是否具备安装条件; 4 、确认可继续安装,则开始机具、材料等准备工作,准备工作原则上控制在 2 天内完成,具体进度需要根据大家的配合程度确定; 5 、开始设备安装到完成安装的时间基本控制在 3-5 天完成; 6 、完成每台设备安装后需要对设备进行调试、试运行,具体时间不确定,需要根据系统运行情况确定; 7 、已安装设备正常运转后开始下一台设备的安装; 8 、完成项目安装后,需要有工程部、技术部、甲方对安装进行验收工作; 9 、完成安装撤离现 Third, the installation process: 1. According to the company's overall project progress, the engineering department will issue a monthly installation plan every month. For business managers who have entered the installation process, they need to ensure that the prerequisite work is completed and the project progress is reported; 2. Team Arrive at the scene, it needs to be connected by the person in charge of the business and completed with the competent department of Party A; 3. The construction team will further verify the construction details to determine whether the installation conditions are met; 4. To confirm that the installation can be continued, start the equipment and materials Wait for the preparation work. In principle, the preparation work should be completed within 2 days. The specific progress needs to be determined according to the cooperation of everyone. 5. The time from the start of the installation to the completion of the installation is basically controlled within 3-5 days. 6. The installation of each device is completed. After that, the equipment needs to be debugged and commissioned. The specific time is uncertain and needs to be determined according to the system operation. 7. After the installed equipment is running normally, the installation of the next equipment is started. 8. After the project installation is completed, an engineering department, The technical department and Party A carried out the inspection and acceptance of the installation; 9. Completed the installation and withdrawal field.

  • Kewei WeChat QR code
  • QR code for mobile station
Copyright © 2014 Zhejiang Kewei Energy Saving Technology Co., Ltd. All Rights Reserved.